Repair work to connect the drainage system from the Townhomes to the master drain is tentatively scheduled on Monday, December 12th. The work will be performed on the drainage located on Derby Park Alley and connect it to the main drain on Vermillion Ave. The work will be done in the area between unit 11939 & 11933.